Methodology
of a Repair, This course outlines the NBIC methodology
of repair, requirements of the Repair Organization, and duties of the
Inspector using an ASME Section I Power Boiler tubesheet as the repaired
pressure-retaining item as the example.
For
AI or IC Commissioned Inspectors with the "R" Endorsement, the principal
responsibilities are to understand NBIC rules and to verify compliance during
repair activities.
Learning
Outcomes
After completing this course, students will be able to:
Identify "R" Certificate Holder considerations.
Identify NBIC and ASME Code requirements.
Recognize when
alternative methods may be used.
Recognize which Inspectors are to be notified.
Identify
and list the documentation used for a repair.
Describe
the areas of Inspector involvement.
Identify
applicable Quality System requirements.
Reference
Materials
Although not required, each student may find it helpful to
have the following materials (currently mandated edition):
ASME
Section I, Rules for
Construction of Power Boilers
National Board Inspection Code, Part 3,
Repairs and Alterations
National Board RCI-1, Rules for Commissioned
Inspectors
Note: ASME Code and Standards may be
ordered through the ASME
website.
Criteria
for Successful Completion
As a minimum, for a National
Board Certificate of Completion to be issued, students must: